CBRNSimulation Systems
Module 02 (Developed & Field-Ready) · Tailored to Your Unit SOPs

Personneldecontamination

Fully developed and field-tested. Eight stations, liquid control line enforcement, and respirator off last. Tailored to your unit's specific protective suits and doffing sequence.

Scroll
PDS · Procedure

Eight stations — One control line

Simulation rule

Every pull is judged on direction, distance from the face and grip. Poor technique carries agent to the layer beneath — and the monitor will find it.

  1. 01

    Gear decontamination

    Weapon and personal kit first. Nothing crosses the lane carrying agent.

  2. 02

    Overboots, gloves, hood

    Outer layers off in order — away from the face, outside never touching inside.

  3. 03

    Overgarment removal

    Bad technique carries contamination onto the layer beneath. It is tracked.

  4. 04

    Across the control line

    Outer boots and gloves off, then over the line. Cross contaminated and the drill fails.

  5. 05

    Monitor survey

    A hit means spot decontamination and a re-survey. Three strikes is a failure.

  6. 06

    Respirator removal

    Only after the monitor clears the soldier. Early is a critical fault.

  7. 07

    Mask decontamination

    The respirator is treated and sealed — and must not be re-contaminated.

  8. 08

    Reissue

    Clean kit from the reissue NCO. The record closes on the clean side.

Debrief

Every layer, laid out

  • Kit-layout board
  • Per-pull technique
  • Critical-fault log
  • Saved on headset
After-action review PDS
AFTER-ACTION REVIEWPDS · RUN 0291PASSDoffing sequence100%Pull technique88%Control line crossing100%Monitor clearance84%Respirator seal protocol100%TIMELINE · 13:25GearHoodSuitLineMonitorRespReissue
Next bayCHEMChemical Decontamination SystemEnter

Prepare for the Critical
Train Beyond Reality

Request a demo